News

Replacement of control HW and SW for Serail lyophilization including putting into operation

On 30 October, 2012 a contract for replacement of control HW and SW for Serail lyophilization including putting into operation was signed with the company Erba Lachema s.r.o. Lyophilization will be controlled by a control system TC700 (TECO Kolín), an industrial panel PC with visualization will be installed to control and display operating status.

Refurbishment and renovation of a circular cutter

On October  8, 2012 a contract was signed with the company SEEIF Ceramic, a.s. to carry out refurbishment and renovation of a circular cutter Stast-Mezomatic with electronic adjustment of the length of the cut. Partial refurbishment and renovation of the cutter will include mechanical and electrical adjustments. Electric speed control and adjustment of the length of the cut are controlled by a PLC Foxtrot and a servo inverter.

Handing over of a rope and chain shifter

On September 20, 2012 purchase objects - a rope shifter (length 26,5m) and a chain shifter (length 6m) - were delivered and handed over to the company TEPLOTECHNA PRŮMYSLOVÉ PECE, s.r.o.

Delivery of a rope and chain shifter

On July 27, 2012 a purchase contract with the company TEPLOTECHNA PRŮMYSLOVÉ PECE, s.r.o. for delivery of a rope shifter (length 26,5m) and a chain shifter (length 6m) was signed.