On July 24, 2012, based on the Contract for Work the last stage of the Project of total reconstruction of the wiring system in the City District Office Brno-Jundrov was finished. Project documentation was handed over in the three stages with the possibility to carry out subsequent repair of wiring in the individual steps.
On July 2, 2012, debugged control software of the preparation plant in the brick factory Hodonín was handed over and put into full operation after trial operation had been finished. During the trial operation customer´s staff and service workers were trained. The new switchboard includes a programmable controller TC700PLC (TECO), the control panel includes an operator panel ID-08 for displaying the operating status and setting values required for operation. Delivery includes wiring documentation and switchboard test protocol.
On June 28, 2012 project documentation of heavy-current and low-current installation and Measurement and Ragulation in the form of detail design documentation and tender documentation for the project Construction Work and Extension of the Apartment House Bratislavská 36a, Brno-Zábrdovice was handed over.