A production line for flue liners put into full operation
On August, 16, 2011 trial operation of a production line for flue liners in the plant D02 Velké Opatovice finished and the line was put into full operation. Full operation included the hand-over of operational documentation, updated operation manual, installation of a cleaning equipment for flue liner burrs and the hand-over of the equipment into trial operation.