Kouzelne Medlanky

Commercial and apartment building, Brno – heavy- and light-current installation, lightning conductor, documentation for the building license, project documentation.

ÚSKVBL

Institute for State Control of Veterinary Biologicals and Medicines) – construction of new parts and reconstruction of some old parts, lightning conductor.

Documentation for building license, documentation for building contract, project documentation.

Pila Tesany

Reconstruction of the wiring system  in four halls on the premises  – heavy-current installation. Operational project documentation.

Zetor Tractors Corp.

Street lighting electricity distributions on all the premises, head electricity distributions of emergency lighting in halls, busbar distribution to machines, lighting in halls - Operational project documentation.

Brick factory Gomel - Belorussia

Project documentation of individual sectors: material stack, preparation plant, pressing plant, delivery of  control distributors with NS 905 (Tecomat) system, incl. program, delivery of control panel, head-mounting, operation tests and activation.

Brick factory Bile Stolby, Russian Federation - ALTA, a.s.

Project documentation of individual sectors: material stack, preparation plant, pressing plant, delivery of  control distributors with SLC 5/03 (Allen-Bradley) system, incl. program, delivery of control panel with operator panel PanelView 300, head-mounting, operation tests and activation.

Brick factory Kuzmincy, the Ukraine - ALTA, a.s.

Project documentation of of individual sectors: preparation plant, pressing plant, delivery of power and control distributors with TC700 (TECO) system, incl. program, operator panel with panel ID-08 (TECO), head-mounting, operation tests and activation. Remote access to PLC via internet.

Expedition line BKS –KM Beta a.s. Kyjov

Delivery of the control system TC700 (TECO), incl. control program, operating panel  Uniop (Exif), testing, activation. Project documentation and operational documentation.

Roller conveyors

  • packing line for crowns (tops) of Sand-Lime Bricks (SLB) KM Beta comp., Bzenec
  • packing line for Concrete Roofing Tiles (CRT) KM Beta comp., Bzenec, Kyjov

Chain conveyors

  • packing line for crowns, VPC- KM Beta comp., Bzenec
  • packing line BSK- KM Beta comp., Kyjov, Bzenec 
  • production line for accessories BSK- KM Beta comp., Kyjov
  • round wood processing line - ŠLP, Křtiny

Belt conveyors

  • packing line BSK – KM BETA comp., Kyjov
  • production line for accessories BSK – KM BETA comp., Kyjov
  • transportation of  lift rods – brick factory Repov

Box feeders

  • sorting line for fillings, SEEIF Ceramic, division Svitavy
  • production documentation for Strojírny podzimek, Třešť

Chain shifters

    • transportation of  kiln wagons (15 tons) in a VKP (car-type furnace) hall,  SEEIF Ceramic comp., Rájec-Jestřebí

    • new tunnel kiln TPP Olomouc, Ltd., supply tracks, P-D Refractories comp., V. Opatovice

Rope shifters

  • new tunnel kiln, TPP Olomouc, Ltd. – P-D Refractories a.s., V. Opatovice
  • hardening room for a supplement production line CRT – KM Beta  Comp. Kyjov

Chain lifts

  • filling of magazines for pressers - SEEIF Ceramic Comp., Rájec-Jestřebí

Convoy magazines

  • gathering of pressed parts before drying - - SEEIF Ceramic Comp., Rájec-Jestřebí

Elevators

  • gathering and backward sorting of CRT accessories on supports before hardening – accessories production line – KM Beta Comp, Kyjov

Palettes magazines

  • packing line for CRT crowns VPC- KM Beta Comp., Bzenec

  • packing lines for  CRTs – KM Beta Comp., Bzenec Kyjov

Tilter

  • packing line for CRTs, KM Beta Comp., Kyjov.

Cutters

  • pressing plants - SEEIF Ceramic Comp., Rájec-Jestřebí

Multiplier

  • CRT packing line - KM Beta Comp., Bzenec, Kyjov

Support construction for suspended tracks

  • zrací pole- XELLA Pórobeton CZ, s.r.o., Hrušovany u Brna
  • SEEIF Ceramic a.s., Rájec-Jestřebí
  • Installation of magnetic separator – P-D Refractories Comp., V. Opatovice

Magazines and filling hoppers

  • production documentation of a motor covered filling hopper for paper mixture for Pressal group Ltd.
  • Production documentation for sand reservoirs for Gifos, Ltd

Apartment house “Lesnická“

Reconstruction of a hotel and its transformation into an apartment building with 149 flats
New low-current and heavy-current communication wiring, modification of an existing lightning conductor

Apartment building Modřice

Installation of a new telephone system in two entrances of a multistoried building
Communication wiring (low-current installation)

Brno Lesna

Replacement of main house wiring, supplies inside flats, and lighting in common spaces, replacement of the bell-button panel.

Mechanical shear - BMP Zemědělské služby s.r.o.

Replacement of the existing damaged switchboard for a new one, replacement of cabling, replacement of control and signal elements in the control case and replacement of a clutch solenoid valve/brake solenoid valve and inductive position sensors. Operational documentation.

Festive memorial lighting

Festive lighting of a memorial to the citizens of Jehnice who died during  the WWI and WWII at Náměstí 3. května in Brno-Jehnice.  Ground lights were used for the lighting  and were connected to the festive lighting of the square.
Delivery of project documentation, work coordination, negotiations with TSB, a.s., project implementation.

Festive memorial lighting

Festive lighting of a memorial to the citizens of Jehnice who died during  the WWI and WWII at Náměstí 3. května in Brno-Jehnice.  Ground lights were used for the lighting  and were connected to the festive lighting of the square.
Delivery of project documentation, work coordination, negotiations with TSB, a.s., project implementation.

Project documentation for the Biopsy Station at Children´s Medical Centre

Project documentation of heavy-current installation on the lower ground floor and reconstruction of the main low voltage switchboard in the pavilon "L" (zoning documentation and and tender documentation for construction) - Biopsy Station at Children´s Medical centre for the University Hospital Brno - Children´s Hospital (Brno branch - Černá Pole).

Complex of buildings in Krkonoše

Project documentation in the holiday center in the Krkonoše mountains – Hotel Friesovy boudy – modernization, reconstruction of the accommodation unit Andula, sewage plant and a lift station

Kiln car traverser in the plant Keravit Ostrava

Delivery and installation of a new kiln car traverser in the plant Keravit Ostrava incl. of a power distributor. Delivery and installation a new conductor bar system AKAPP. The delivery includes project documentation, a testing protocol of a power distributor and inspection of the equipment wiring.

Production line for flue liners – D02 Velké Opatovice

Delivery of machines and equipment, a power distributor and operator panel incl. control panel, control system TC700 (TECO) incl. control program, testing and activation. The delivery included technical documentation, a declaration of conformity for all the machinery testing protocols of power distributors and inspection of the production line wiring.

Kiln car traverser – P-D Refractories CZ, a.s.

Replacement of a tunnel kiln car traverser for a new one, delivery of a power distributor and control system Foxtrot (TECO) incl. control program, testing, activation. Project documentation and operational documentation, a testing protocol of a power distributor and inspection of the equipment wiring.

Refurbishment circular cutter – SEEIF Ceramic, a.s.

Delivery refurbished circular cutter incl. a power distributor and control system Foxtrot (TECO) incl. control program, testing, activation. The electric speed control and the digital adjustment of the length of the cut. A testing protocol of a power distributor and inspection of the equipment wiring.

HW and SW for Serail lyophilization - Erba Lachema s.r.o.

Control HW and SW for Serail lyophilization. During the operation remote access for control and visualization of the current status of the device was set up for the customer. The whole lyophilization process is controlled by a control system TC700 (TECO Kolín).

Production control ferment for bread

Delivery of a new power distributor and control system Foxtrot (TECO) incl. control program, testing, activation for fermentative production containers, ferment tank and pumping. Project documentation and operational documentation, a testing protocol of a power distributor and inspection of the equipment wiring.