Design, supply and control of lighting in the Bzzzukot complex in Brno-Židenice
Retirement home Mikulášovo nám. Brno – heavy- and light-current installation (wiring), lightning conductor .Operational project documentation.
Commercial and apartment building, Brno – heavy- and light-current installation, lightning conductor, documentation for the building license, project documentation.
Institute for State Control of Veterinary Biologicals and Medicines) – construction of new parts and reconstruction of some old parts, lightning conductor.
Documentation for building license, documentation for building contract, project documentation.
Reconstruction of the wiring system in four halls on the premises – heavy-current installation. Operational project documentation.
Heavy- and light-current installation, lightning conductor. Operational project documentation.
Documentation for the building license, Operational project documentation.
Documentation for the building license, Operational project documentation.
Street lighting electricity distributions on all the premises, head electricity distributions of emergency lighting in halls, busbar distribution to machines, lighting in halls - Operational project documentation.
Delivery of the control system NS950 (TECO), incl. control program, operating panel Uniop (Exif), testing, activation. Project documentation and operational documentation.
Delivery of a power distributor with control software, system TC604+TC632+TC624 (TECO), incl. control program, testing, and activation without a shut-down operation.
Delivery of power and control distributors, system TC652+TC622 (TECO), incl. program, testing and activation.
Project documentation of individual sectors: material stack, preparation plant, pressing plant, delivery of control distributors with NS 905 (Tecomat) system, incl. program, delivery of control panel, head-mounting, operation tests and activation.
Project documentation of individual sectors: material stack, preparation plant, pressing plant, delivery of control distributors with SLC 5/03 (Allen-Bradley) system, incl. program, delivery of control panel with operator panel PanelView 300, head-mounting, operation tests and activation.
Project documentation of of individual sectors: preparation plant, pressing plant, delivery of power and control distributors with TC700 (TECO) system, incl. program, operator panel with panel ID-08 (TECO), head-mounting, operation tests and activation. Remote access to PLC via internet.
Delivery of the control system NS950 (TECO), incl. control program, operating panel Uniop (Exif), testing, activation. Project documentation and operational documentation.
Delivery of the control system TC700 (TECO), incl. control program, operating panel Uniop (Exif), testing, activation. Project documentation and operational documentation.
Delivery of control and power distributors and a control panel, system NS950 (TECO), incl. program, visualization, and data archiving in ControlWeb software.
Delivery of control software LOGO (SIEMENS), testing and activation.
Reconstruction of a hotel and its transformation into an apartment building with 149 flats
New low-current and heavy-current communication wiring, modification of an existing lightning conductor
Construction of a two-generation house
Heavy-current electrical installation
Installation of a new telephone system in two entrances of a multistoried building
Communication wiring (low-current installation)
Replacement of main house wiring, supplies inside flats, and lighting in common spaces, replacement of the bell-button panel.
Replacement of the existing damaged switchboard for a new one, replacement of cabling, replacement of control and signal elements in the control case and replacement of a clutch solenoid valve/brake solenoid valve and inductive position sensors. Operational documentation.
Festive lighting of a memorial to the citizens of Jehnice who died during the WWI and WWII at Náměstí 3. května in Brno-Jehnice. Ground lights were used for the lighting and were connected to the festive lighting of the square.
Delivery of project documentation, work coordination, negotiations with TSB, a.s., project implementation.
Festive lighting of a memorial to the citizens of Jehnice who died during the WWI and WWII at Náměstí 3. května in Brno-Jehnice. Ground lights were used for the lighting and were connected to the festive lighting of the square.
Delivery of project documentation, work coordination, negotiations with TSB, a.s., project implementation.
Project documentation of heavy-current installation on the lower ground floor and reconstruction of the main low voltage switchboard in the pavilon "L" (zoning documentation and and tender documentation for construction) - Biopsy Station at Children´s Medical centre for the University Hospital Brno - Children´s Hospital (Brno branch - Černá Pole).
Heavy-current installation, lighting conductor – Documentation for building license, project documentation.
Project documentation in the holiday center in the Krkonoše mountains – Hotel Friesovy boudy – modernization, reconstruction of the accommodation unit Andula, sewage plant and a lift station
Delivery and installation of a new kiln car traverser in the plant Keravit Ostrava incl. of a power distributor. Delivery and installation a new conductor bar system AKAPP. The delivery includes project documentation, a testing protocol of a power distributor and inspection of the equipment wiring.
Delivery of machines and equipment, a power distributor and operator panel incl. control panel, control system TC700 (TECO) incl. control program, testing and activation. The delivery included technical documentation, a declaration of conformity for all the machinery testing protocols of power distributors and inspection of the production line wiring.
Replacement of a tunnel kiln car traverser for a new one, delivery of a power distributor and control system Foxtrot (TECO) incl. control program, testing, activation. Project documentation and operational documentation, a testing protocol of a power distributor and inspection of the equipment wiring.
Delivery refurbished circular cutter incl. a power distributor and control system Foxtrot (TECO) incl. control program, testing, activation. The electric speed control and the digital adjustment of the length of the cut. A testing protocol of a power distributor and inspection of the equipment wiring.
Control HW and SW for Serail lyophilization. During the operation remote access for control and visualization of the current status of the device was set up for the customer. The whole lyophilization process is controlled by a control system TC700 (TECO Kolín).
Delivery of a new power distributor and control system Foxtrot (TECO) incl. control program, testing, activation for fermentative production containers, ferment tank and pumping. Project documentation and operational documentation, a testing protocol of a power distributor and inspection of the equipment wiring.
Delivery of new power and operating switchboard including new HW and operating SW. Two PCs with touch screen are installed in operating boxes for displaying and entering parameters. The equipment is controlled by control system TC700 (TECO Kolín). Project documentation and operational documentation, a testing protocol of a power distributor.
Project documentation of high-voltage and low-voltage current wiring of renovated premises of Labour Office in Hodonín, replacement of existing reserve system.
Project documentation of high-voltage anf low-voltage current wiring and lightning protection system to Nursery in Brno-Jehnice.
Project documentation of high-voltage current wiring of renovated in the City District Office Brno-Jundrov.