Reference details

ČEZ, a.s .; Temelín Nuclear Power plant VVER 1000

Order:
Since 2003 - 2012, the creation of a digitalized TRACEMAN SW model for SW tracing and cabling management. More than 6,500 cables were newly shaken. The administration was applied to more than 110 buildings containing 30 thousand. cable routes and more than 110 thousand cables with a total length of 7,699 km.

The created database was handed over to ČEZ, a.s.

Period: 2003 - 2012

Destination: Czech Republic